You need to overclock: 1 Nükleer Enerji Santrali at 250%, 1 Nükleer Enerji Santrali at 200%.

You need to underclock: 1 Nükleer Enerji Santrali at 49,2%.

Yakıt girdisi
Ekstra Yük
  • 2.398,08 m³ Su Su