You need to overclock: 2 Nükleer Enerji Santrali at 250%, 1 Nükleer Enerji Santrali at 150%.

You need to underclock: 1 Nükleer Enerji Santrali at 48,4%.

Yakıt girdisi
Ekstra Yük
  • 2.396,16 m³ Su Su