You need to overclock: 1 Nükleer Enerji Santrali at 250%, 1 Nükleer Enerji Santrali at 200%.

You need to underclock: 1 Nükleer Enerji Santrali at 47,6%.

Yakıt girdisi
Ekstra Yük
  • 2.394,24 m³ Su Su