You need to overclock: 1 Nükleer Enerji Santrali at 250%, 1 Nükleer Enerji Santrali at 150%.

You need to underclock: 1 Nükleer Enerji Santrali at 97,2%.

Yakıt girdisi
Ekstra Yük
  • 2.393,28 m³ Su Su