You need to overclock: 3 Nükleer Enerji Santrali at 250%, 1 Nükleer Enerji Santrali at 200%.

You need to underclock: 1 Nükleer Enerji Santrali at 47,2%.

Yakıt girdisi
Ekstra Yük
  • 2.393,28 m³ Su Su