You need to overclock: 1 Nükleer Enerji Santrali at 250%, 1 Nükleer Enerji Santrali at 150%.

You need to underclock: 1 Nükleer Enerji Santrali at 95,2%.

Yakıt girdisi
Ekstra Yük
  • 2.388,48 m³ Su Su