
Geyser 19 (Derelict)
This Megaprint is just for fun.
This adds the now inactive Geyser 19 in the Dune Desert that was removed from the Game in Early Access update 4 (I think) The Geothermal Vent has long since gone inactive & the Generator has been left to Rust.
- Generates NO Power
- You Can't build a Geothermal Generator in this location anymore
- I pulled this from one of my old saves to use in 1.0 as a nice Nod back to my many hours in Early Access.
- Öğe Sayısı 92
- Koordinatlar 363.700 / -201.250
- Yalnızca orijinal konuma yapıştırın Yes
- Kategoriler Architecture UPDATE 8 Stable (1.0)
- Oluşturma tarihi 3 Eyl 2024 09:47:06