Gatehouse part 1 (left)

gate house part 1 - left

(power line for the light is inside the inner big concrete pillar, break down both top inner pillars of both blueprints closest to the barriers, and connect it to the bottom underneath it, then where you need it to go)

  • Öğe Sayısı 153
  • Oluşturma tarihi 11 Haz 2025 21:58:16
  • Son Güncelleme 11 Haz 2025 21:58:47