This drawing will help you unlock the 2nd phase of the Space Elevator
Input data:
- Iron: 235.5 per minute
- Copper: 48 per minute
- Coal: 129 per minute
Size: 10*10 foundations Production:
- Smart Plating 2 per/min
- Versatile Framework 5 per/min
- Automated Wiring 2 per/min
The drawing uses a conveyor belt mk3 and a power pole mk2
You may also need my drawing for the 3rd and 4th phase of the Space Elevator
- Öğe Sayısı 936
- Kategoriler Architecture Complete factory UPDATE 7
- Değerlendirme
- İnşa Sürümü 211.839
- Eser Sahibi Elfim0FF
- İndir (7.022x) Download SBP Download SBP Config
- File size 79,86 KB
- Created on 18 May 2023 05:10:34
- Last updated on 18 May 2023 21:31:26
- Live preview (Alpha Test) See blueprint