Coal Power Station 10 800 MW/h by Chaaa-Y Gaming
Coal plant in vanilla without mods. 144 charcoal generators for a total of 10,800MW / h. Of course the dam where I placed 25 batteries is used to rescue the pumping + drilling in case of problems. Thanks to centralized management (circuit breaker room). A video is on my channel for the visit if you wish to discover the installation in detail.
Vidéo: https://youtu.be/zPUk3Lln8dk
Centrale charbon en vanilla sans mods. 144 générateurs charbons pour un total de 10 800MW/h. Bien sur le barrage ou j'ai placé 25 batteries sert a secourire le pompage + forage en cas de soucis. Le grâce à une gestion centralisé ( salle de disjoncteurs ). Une vidéo est sur ma chaine pour la visite si vous souhaitez découvrir l'installation en détail.
- Öğe Sayısı 11.370
- Koordinatlar -87.890 / -47.516
- Yalnızca orijinal konuma yapıştırın No
- Kategoriler Complete factory UPDATE 4
-
Değerlendirme
5 / 5
- İnşa Sürümü 152.331
- Eser Sahibi Chaaa-Y Gaming
- İndir (9.760x) İndir
- File size 1,01 MB
- Created on 21 Haz 2021 18:39:31
- Basit Duvar 4m 1.516
- Güç Hattı 1.496
- Boru Hattı v.2 1.302
- Cam Çerçeve Temel 824
- Duvar Prizi v.1 563
- Çift Rampa 2m 469
- Tekli Pencere 461
- Temel 1m 432
- Taşıma Bandı v.5 422
- Çerçeve Temel 404
- Boru Hattı Desteği 357
- Boru Hattı Duvar Deliği 320
- Endüstriyel Korkuluk 244
- Çift Taraflı Duvar Prizi v.1 242
- Çapraz Boru Hattı Bağlantı Noktası 223
- Projektör Işık Duvar Aparatı 198
- Temel 4m 181
- Ters Rampa 1m 144
- 2 Taşıma Bantlı Duvar 144
- Kömür Jeneratörü 144
- Boru Hattı Duvar Aparatı 132
- Rampa 4m 113
- Pencereli Duvar 96
- Ters Rampa 4m 91
- Taşıma Bandı Desteği 76
- Taşıma Bandı Ayırıcı 75
- Akıllı Ayırıcı 72
- Çeyrek Boru 56
- Su Çıkarıcı 54
- Boru Hattı Pompası v.2 48
- Yürüme Platformu T Kavşağı 46
- Taşıyıcı Asansör v.5 33
- Büyük Metal Sütun 25
- Güç Depolama Birimi 25
- Düz Yürüme Platformu 24
- Merdiven 18
- Büyük Sütun Desteği 17
- Dış Köşe Çeyrek Boru 16
- Geçit Delikli Duvar 16
- 3 Taşıma Bantlı Duvar 14
- Projektör Işık Kulesi 13
- Yürüme Platformu Kavşağı 12
- Ters Çeyrek Boru 10
- Yürüme Platformu Rampası 8
- KiÅŸisel Depolama Kutusu 8
- Basit Duvar 4m 6
- 1 Taşıma Bantlı Duvar 6
- Yürüme Platformu Köşesi 6
- Üst Köşe Rampası 4m 4
- Sokak Lambası 4
- Güç Şalteri 4
- Çift Rampa 4m 3
- Madenci v.3 3
- Ters Üst Köşe 4m 2
- Lamba Kontrol Paneli 1
- Yan Kapılı Duvar 1
- Elektrik DireÄŸi v.3 1
- Beton 17.087
- Tel 6.704
- Kablo 5.976
- Bakır Levha 5.643
- Hızlıtel 5.395
- Çelik Kiriş 3.684
- Güçlendirilmiş Demir Levha 3.569
- Demir Çubuk 3.283
- Mil 2.124
- Plastik 1.686
- Demir Plaka 1.580
- Silika 1.114
- Kaplanmış Endüstriyel Kiriş 692
- Çelik Boru 635
- Alclad Alüminyum Levha 488
- Yüksek Hızlı Bağlayıcı 485
- Modüler Çerçeve 250
- Statör 125
- Motor 96
- YZ Sınırlayıcı 79
- Lehimlenmiş Modüler Çerçeve 30
- Süperbilgisayar 15
- Taşınabilir Madenci 9
- Turbo Motor 9
- Kauçuk 3
-
NeoMod - 23 Nis 2024 16:35:30
P.S. yes, you most certainly "abused" the lighting system. But the overall effect justifies the monstrous consumption 😜
-
NeoMod - 23 Nis 2024 16:34:11
// TL;DL; The power connection is on the top side of the external wall of the "power control room" which is situated in the round basement of one of the main beams near the central hub. You'll spot it easily because it's the only one with a ramp on the front. // Very nice work, thanks for sharing. Probably you should make a short video explaining where is the main grid connection to power the whole structure: I had to go trough your video in french (altough you made some nice jokes, it was "still french" for me...🤣) to understand how you designed the wiring. Update 8 has changed some of the landscape, so there are a few adjustments to be made: the wall on the inside of the "hydroelectric dam" is now partially clipped by some water and the waterfall is now larger; the "central round hub" and some conveyors are now clipped by forest, with some tree that needs force removal.
-
Sineus - 13 Nis 2023 01:54:03
Where to connect the electricity, the main switch has not been found. I wanted to look for answers on the author's video channel, but everything is deleted there, and some kind of French moron rejoices.
-
H0n_Za- - 7 Ara 2022 16:43:30
nice build. is there any intended powerpole to conect my existing grid to. so all switches work nicely? (I have connected those two powercords above the switches)
-
brn0 - 26 Eki 2022 16:07:41
If you remove the ceilling right above the reserve switch you will find 4 plugs (1 top + 3 botton) remove also the ceilling above secondary baterie switch you will see a MK3 power oulet(its the only one there) connect the middle plug (from the botton line) to this mk3 and it will work :)
-
UcantCcanU - 12 Tem 2022 20:12:59
There was 1 connection that needed to be made over the battery switch that was missing. Once that is connected it starts right up with the battery backup
-
JackShnaps - 17 May 2022 07:59:58
Try powering from an external power source, such as a biomass burner
-
Dazio99 - 11 Nis 2022 09:07:09
Very impressive, great design and planning, kudos!
-
danbuck84 - 27 Şub 2022 00:28:44
Amazing! But how do I turn this on?
-
BlazerBuddy - 10 Şub 2022 01:06:33
Does this still work in Update 5?
-
shilei97.1 - 9 Şub 2022 19:36:06
How to use/turn on this power station? I can't figure it out...