Edu's Big Road: Ramp Down (upper) segment

The upper part of a ramp segment of the road going down. 2 lanes, 12m each, with a walkway and space below for a hidden conveyor bus.

  • Created on 19.11.2022 22:18:58
  • Last updated on 19.11.2022 22:19:16