AIO Iron Products

Just another one-click-factory for all the possible products from a lone Iron Ore node.

Focus of this blueprint is absolute lowest build cost. Only up to Mk2 belts needed. Fully walkable. Minimal clipping. I also tried to make it 100% efficient, but theres an issue with Iron Rods being a couple of seconds late for the RIPs, not a major issue, but enough to call this an unfinished blueprint. Update to come. eventually. For now it will produce at almost 100% efficiency after about 1hr from being connected to resource node and power. Oh, and it's roughly color coded to each of the four smelter production lines. White is when they cross over.

I've also used two alternate recipes (Stitched Iron Plate and Iron Wire), but keep in mind you DO NOT need the recipes unlocked in order to build blueprint. Just don't change the selected recipes!

Simplified production line: (actual in second carousel image)

https://satisfactory-calculator.com/en/planners/production/index/json/%7B%22Desc_IronRod_C%22%3A%225%22%2C%22Desc_IronPlate_C%22%3A%2210%22%2C%22Desc_IronPlateReinforced_C%22%3A%223.375%22%2C%22Desc_ModularFrame_C%22%3A%222%22%2C%22Desc_Rotor_C%22%3A%221.6%22%2C%22Desc_Wire_C%22%3A%225%22%2C%22Desc_Cable_C%22%3A%2210%22%2C%22input%22%3A%7B%22Desc_OreIron_C%22%3A%22780%22%7D%2C%22altRecipes%22%3A%5B%22Recipe_Alternate_ReinforcedIronPlate_2_C%22%2C%22Recipe_Alternate_Wire_1_C%22%2C%22Recipe_Alternate_Screw_C%22%5D%7D

IN:

120 (119.625)/m - Iron Ore

85.84.4MW

OUT:

10/m - Iron Plate

5/m - Iron Rod

5/m - Wire

10/m - Cable

4.3.375/m - Reinforced Iron Plate

2.1.6/m - Rotor

2/m Modular Frame (first two @ 6min)

Please note that although I have marked this as Modded, you DO NOT need mods to use it. The mods I used are only needed for placing objects within blueprint designer. Infinite Nudge for fine placement adjustments and DaisyChainEverything for connecting multiple power lines to machines.

  • Criado em 05/01/2024 18:33:17
  • Última atualização em 05/01/2024 18:33:51