Industrialbeams

Hello,

This blueprint will be part of a bigger project to make 12HMF per, but you can also use it as it is. It produces 60 Industrial beams per minute and 60 pipes.

IT IS NOT GOLD STANDARD, i probably missed a wall here and there. everything load balanced and 100% effective

Uses 1 pure coal (200%), 2 normal iron (200%), 3 normal limestone (250%) and uses around a 1MW

  • Classificação
    5 / 5
  • Versão da compilação 195.135
  • Autor Aquiad
  • Transferir (1.323x) Transferir
  • Tamanho do ficheiro 346,27 KB
  • Criado em 31/07/2022 11:46:26