The Jorveig MO2 is a next-generation Colossus facility, designed for large-scale refinery operations. Fully modular and stackable, this facility improves upon previous models by combining enhanced logistics, energy management, and pipeline performance with refined accessibility and organization.
Note: The base of the facility is not included in the blueprint to allow for easier expansion and maintenance. The base blueprint is essential for the facility's operation.
See Velge MOP2 platform: https://satisfactory-calculator.com/en/blueprints/index/details/id/10652/name/Velge+MOP2+%28platform%29
⚙️ Core Enhancements
Remanaged Energy Control
The facility now features a streamlined physical interface and upgraded pump controls.
Improved Pipeline System
Input pipeline pressure has been stabilized to prevent the drops that occasionally affected MO1 operations.
Conveyor Network Upgrades
With the introduction of vertical splitters and mergers (v1.1), inter-floor supply and distribution issues from previous facilities have been resolved. Resource flow between levels is now smooth, flexible, and reliable, minimizing bottlenecks.
Vanilla-Compatible Light & Emergency Network
Now it's full-vanilla supported, with emergency lighting and accessible networks integrated throughout. While the facility remains tight and space-efficient, it is now more organized.
🏗️Setup
- Place on top MOP2 (Mind the elevator direction and alignment).
- Extend the elevator from MOP2.
- Connect input and output pipes and conveyors to MOP2.
- Connect electricity from the elevator.
- Open the valves.
⚠️ Operational Note
As with large modular facilities, minor issues with pipeline or conveyor connectivity may still occur due to the game’s known issues related to the pipe connection. If resource flow appears interrupted, verify segment connections or reload affected sections. These occasional glitches are normal and do not indicate facility malfunction.
Let me know about anything to improve. Have fun!
- Contagem de itens 1.580
- Categorias Architecture Power lines Pipes system Stable (1.1)
- Classificação
- Versão da compilação 433.351
- Autor Solara System
- Transferir (104x) Transferir SBP Transferir configuração SBP
- Tamanho do ficheiro 96,89 KB
- Criado em 18/10/2025 18:02:40
- Última atualização em 19/10/2025 18:11:48
- Pré-visualização ao vivo (Alpha Test) See blueprint