Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Kabel 1x Kabel
Constructor
Constructor
Kabel (1/min)
Constructor
Constructor
Draad (2/min)
Smelterij
Smelterij
Koperstaaf (0.66666666666667/min)
Needed per minute
Flower Petals0,5x Flower Petals
Color Cartridge1x Color Cartridge
Koper erts0,66666666666667x Koper erts
Koperstaaf0,66666666666667x Koperstaaf
Draad2x Draad
Kabel1x Kabel