Desert Motors Factory
Factory in the Dune Desert to make multiple motor-related products. Please note that this factory requires many external inputs and my other blueprints https://satisfactory-calculator.com/megaprints/index/details/id/1205/name/Desert+Control+Rods+Factory+%28Update+6%29 and https://satisfactory-calculator.com/megaprints/index/details/id/1206/name/Desert+Steelworks.
Power switches are in the frame center building south west of the main site. Truck routes needed to get Caterium, Concrete and Quartz Crystal from remote processing sites.
Manufacturer Towers
3 manufacturer towers, each tower has power switches in the basement, and storage + drone ports on the roof. Manufacturers consisting of:
- Thermal Propulsion Rocket manufacturers x 6
- Modular Engine manufacturers x 18
- Turbo Pressure Motor manufacturers x 6
- Rigor Motor manufacturers 18
- Insulated Crystal Oscillator manufacturers x 12
- Magnetic Field Generator manufacturers x 6
- Cooling System blenders x 4
Assembler Towers
Tower A1 assembles plate related products, with a drone port on the roof, consisting of:
- Smart Plate assemblers x 24
- Reinforced Iron Plate assemblers x 12
Tower A2 assemblers rotors and beams, with a drone port on the roof, consisting of:
- Steel Rotor assemblers x 24
- Fused Wire assemblers x 12
Tower A3 assemblers stators, with drone port on the roof, consisting of:
- Stator assemblers x 32
- Fused Wire assemblers x 4
Tower A4 assembles frames and aluminum products, with a drone port on the roof, consisting of:
- Heat Sink assemblers x 12
- Alclad Aluminium Sheet assemblers x 15
- Fused Wire assemblers x 8
Frame Center
This is the building in the south-west specifically for producing frame products, and also contains the site power room.
- Reinforced Iron Plate assemblers x 6
- Encased Industrial Beam assemblers x 12
- Steeled Frame assemblers x 12
- Alclad Casing assemblers x 4
- Versatile Framework assemblers x 4
- Heavy Encased Frame manufacturers x 3
- Fused Modular Frame blenders x 4
Blueprint Inputs
This blueprint requires https://satisfactory-calculator.com/megaprints/index/details/id/1205/name/Desert+Control+Rods+Factory+%28Update+6%29 and https://satisfactory-calculator.com/megaprints/index/details/id/1206/name/Desert+Steelworks to deliver via conveyor belt under the road on the west side of the main buildings (should be easy to match, the conveyors are currently full of the required resource):
- Screws (2 belts)
- Iron plates
- Copper sheets
- Steel beams
- Steel Pipe
- Electromagnetic Control Rods
- AI Limiters
Also required via the train stations are:
- Aluminum Ingots 900pm
- Rubber 475.5pm
- Packaged Nitrogen 270pm (for turbo pressure motors)
- Batteries 30pm (for magnetic field generators, plus extra for drone ports)
- Fuel for trucks
And via drone port on tower A4
- Pressure Conversion Cubes 11.25pm (for turbo pressure motors)
Modded Content
This blueprint uses oversized pieces for walls, floors and roads. If you wish to modify the oversized pieces, I recommend a mod called Micro Manage.
Version History
- Version 3.0, latest version with update 6 parts
- Version 4.0. general reorganization with update 8 parts.
- Hoeveelheid spullen 13.322
- Coördinaten 313.198 / -236.121
- Alleen plakken op originele locatie Yes
- Categorieën Architecture Complete factory Exterior decorations Pipes system Tracks system Modded UPDATE 8
- Created on 26 sep. 2022 10:52:11
- Last updated on 1 dec. 2023 07:25:31
- Stroomkabel 1.352
- Fundering 1m 1.006
- Paneel Raam 830
- Transportband Mk.3 806
- Wandcontact Mk.1 530
- Gekantelde Muur 8m 490
- Standaard Muur 4m 471
- Transportbandverdeler 442
- Transportlift Mk.2 438
- Transportlift Mk.1 406
- Ondersteuning Transportband 387
- Paneel Raam 366
- Transportband samenvoeger 357
- Transportband Mk.5 322
- Fundering 1m 299
- Transportlift Mk.3 280
- Lantaarnpaal 221
- Vloergat Transportlift 204
- Standaard Muur 1m 198
- Frame Raam 198
- Plafondlamp 187
- Assembleerder 182
- Catwalk Trap 162
- Pijpleiding Mk.1 161
- Transportlift Mk.5 151
- Standaard Muur 4m 146
- Grote Betonnen Pilaar 131
- Glazen Frame Fundering 118
- Transportband Mk.4 117
- Pijpleidingsondersteuning 111
- Transportband Mk.2 109
- Industriële Reling 102
- Halve 1m Fundering 78
- Frame Fundering 76
- Gekantelde Muur 8m 73
- Fabrikator 69
- Plat Dak 68
- Catwalk Kruising 68
- Omgekeerde Hellingmuur 8m 55
- Vierkant Bord 0.5m 54
- Muur met Deur Zijkant 49
- Fundering 4m 48
- Volledig Frame Raam 46
- Kleine Betonnen Pilaar 43
- Pijpleidingskruispunt 40
- Spoorweg 38
- Transportlift Mk.4 37
- Opslagcontainer 35
- Catwalk T-Splitsing 34
- Gekantelde Muur 4m 33
- Transportband Plafondmontage 32
- Transportbandmuur x3 29
- Pijpleiding Mk.2 29
- Pijpleiding Mk.1 (Geen Indicator) 29
- Catwalk Hoek 28
- Stroomschakelaar 26
- Portret Bord 25
- Omgekeerde Helling 1m 24
- FICSMIS Sneeuwmachine 24
- Industriële opslagcontainer 22
- Hellingmuur 8m 21
- Omgekeerde Hellingmuur 4m 20
- Moderne Reling 18
- Pijpleiding muurondersteuning 18
- Gespoten Balk 17
- Labelbord 3m 17
- Catwalk Helling 15
- Omgekeerde Hoek Omhoog 1m 14
- Transportbandmuur x2 14
- Springbronontginner 14
- Blok Seinpaal 14
- Muur met Deur Midden 12
- Smeltoven 12
- Vrachtperron 12
- Energiemast Mk.1 12
- Catwalk Recht 11
- Ladder 11
- Vierkant Bord 1m 11
- Raffinaderij 11
- Vrachtwagenstation 11
- Halve 4m Fundering 10
- Metalen Balk 10
- Muur met Deur Midden 10
- Dronehaven 10
- Lichtbedieningspaneel 9
- Gekantelde Holle Muur 8m 9
- Delver Mk.3 9
- Metaalgieterij 8
- mixer 8
- Muurdoorgang Pijpleiding 8
- Fundering 4m 7
- Omgekeerde Hoek Omhoog 1m 7
- Kleine Frame Pilaar 7
- Transportbandmuur x1 7
- Muur met Deur Zijkant 7
- Muurbevestigingspunt Transportband 7
- Fundering 1m 6
- Kleine Metalen Pilaar 6
- Barricade 6
- Transportband Mk.1 6
- Dubbele Helling 2m 5
- Fundering 2m 5
- Hoek Helling Omhoog 1m 5
- Gekantelde Muur 4m 5
- Dubbele Helling 2m 4
- Labelbord 4m 4
- Water-extractor 4
- Padsein 4
- Prioriteitsstroomschakelaar 4
- Schijnwerpertoren 3
- Spoorwegschakelaar 3
- Treinstation 3
- Hoogspanningsmast Mk.2 3
- Fundering 1m 2
- Fundering 2m 2
- Springbrondrukregelaar 2
- Intelligente verdeler 2
- Dubbele Helling 4m 1
- Hoek Helling Omhoog 1m 1
- Helling 1m 1
- Grote Metalen Pilaar 1
- Hellingmuur 2m 1
- Persoonlijke opslag 1
- Pijpleiding Mk.2 (Geen Indicator) 1
- Pijpleidingspomp Mk.1 1
- Hoogspanningsmast met Platform 1
- Beton 14.615
- Hogesnelheidsdraad 12.397
- Kabel 8.521
- Draad 6.548
- IJzeren Stang 4.645
- IJzeren plaat 4.340
- Stalen balk 4.037
- Plastic 3.620
- Silica 2.880
- Versterkte ijzeren plaat 2.641
- Echte Sneeuw 2.400
- Stalen pijp 1.378
- Alclad aluminiumplaat 1.124
- rotor 1.074
- Zwaar modulair frame 1.054
- Aluminium behuizing 900
- Koperplaat 782
- motor 775
- Kwartskristal 426
- Gewapend betonnen balk 425
- Hogesnelheidsverbinding 292
- Modulair frame 245
- Zuurstok 240
- Radiografische controle-eenheid 140
- Rubber 100
- Gefuseerd Modulair Frame 90
- KI-begrenzer 55
- Computer 52
- FICSMIS versiering 48
- Supercomputer 45
- Printplaat 44
- Draagbare delver 27
- Turbomotor 27
-
xbb1024 - 4 apr. 2023 12:58:31
I've redone the control rods megaprint and it now includes more of the rail system.
-
dak4482 - 5 jan. 2023 06:39:19
am I missing something. Are the the tracks heading south from Dune Steelworks B supposed to connect to something? They just end just north of Dune South A whose tracks are not connected to anything. I installed the two other BP mentioned above. Am I missing something else?
-
bluna - 30 okt. 2022 16:38:45
Hey, check ur discord pn :)
-
xbb1024 - 10 okt. 2022 00:33:15
I use Micro Manage for resizing / adjusting pieces. It's not necessary to use the blueprint however.
-
littlejoe1966 - 8 okt. 2022 16:43:52
what is the name of the mod you are using?