Desert Steelworks
Desert metalworks factory primarily to produce steel pipe (to supply my Desert Motors factory), but also produces steel beams, copper sheets, iron plates and screws.
Steelworks
The southern site in this blueprint, featuring 96 Iron Ingot smelters and 48 Solid Steel Ingot foundries. Coal is delivered via train.
Metal Fabrication Factory
Produces basic metal parts, featuring:
- 14 x Caterium Wire constructors
- 14 x Cable constructors
- 45 x Iron Plate constructors
- 14 x Iron Rod constructors
- 14 x Steel Beam constructors
- 28 x Copper Sheet constructors
- 56 x Steel Pipe constructors
- 30 x Cast Screw constructors
Ground floor of the middle building contains the power room for the site.
Logistics
Train route to collect coal from the north of the desert to the steelworks. Second train route to deliver metals from the steelworks to metal fabrication factory. At the factory, produced goods are delivered both by conveyors under the road, and by truck in case your factory is far away. If you want to use the truck stations, you will need to supply fuel (input under south road, indicated by a sign).
Power switches inside the middle building ground floor of the main factory site. Connect power to any of the power pylons running south-north.
Version History
- V1.0: Initial Version.
- V2.0: updated together with my desert motors factory in the area. Also uses Update 6 parts.
- v2.1: Fixed missing conveyor lift on steel foundry output (south foundry stack). Also minor adjustments to railway.
- V3.0: Overall reorganization using update 8 pieces, adjusted to work with my other Dune Desert megaprints.
Modded Content
This blueprint uses oversized pieces, mainly for walls, roads and walkways. I have left the floor under constructors as regular pieces to allow for easier change.
- Hoeveelheid spullen 8.383
- Coördinaten 318.494 / -198.311
- Alleen plakken op originele locatie Yes
- Categorieën Architecture Complete factory Tracks system Modded UPDATE 8
- Created on 7 dec. 2021 04:32:24
- Last updated on 1 dec. 2023 07:48:46
- Stroomkabel 930
- Fundering 1m 829
- Transportband Mk.5 766
- Transportbandverdeler 440
- Transportlift Mk.1 428
- Transportlift Mk.5 409
- Transportlift Mk.2 302
- Transportband samenvoeger 282
- Standaard Muur 4m 272
- Ondersteuning Transportband 247
- Frame Fundering 234
- Wandcontact Mk.1 224
- Samensteller 215
- Gekantelde Muur 8m 211
- Paneel Raam 210
- Transportband Mk.2 178
- Smeltoven 132
- Plafondlamp 107
- Spoorweg 104
- Halve 1m Fundering 100
- Transportband Mk.4 91
- Grote Betonnen Pilaar 85
- Transportband Mk.3 70
- Fundering 1m 68
- Lantaarnpaal 68
- Fundering 4m 66
- Standaard Muur 4m 59
- Volledig Frame Raam 58
- Metaalgieterij 56
- Glazen Frame Fundering 54
- Gespoten Balk 47
- Standaard Muur 1m 47
- Vloergat Transportlift 47
- Catwalk Helling 38
- Catwalk Trap 32
- Industriële opslagcontainer 31
- Transportlift Mk.4 31
- Blok Seinpaal 29
- Vrachtperron 29
- Metalen Balk 26
- Ladder 26
- Fundering 2m 25
- Halve 4m Fundering 24
- Kleine Betonnen Pilaar 24
- Transportlift Mk.3 23
- Energiemast Mk.1 23
- Quarterpipe 22
- Portret Bord 21
- Labelbord 3m 21
- Spoorwegschakelaar 19
- Fundering 1m 18
- Delver Mk.3 17
- Stroomschakelaar 16
- Muur met Deur Zijkant 15
- Padsein 14
- Fundering 1m 12
- Kleine Metalen Pilaar 12
- Gekantelde Muur 4m 11
- Catwalk Recht 11
- Vierkant Bord 1m 11
- Stapelbare Ondersteuning Transportband 11
- Omgekeerde Hoek Omhoog 1m 10
- Vierkant Bord 2m 10
- FICSMIS Sneeuwmachine 10
- Transportband Plafondmontage 10
- Dubbele Helling 8m 9
- Catwalk T-Splitsing 9
- Intelligente verdeler 9
- Treinstation 9
- Halve 2m Fundering 7
- Plat Dak 7
- Catwalk Hoek 7
- Kleine Frame Pilaar 6
- Omgekeerde Hellingmuur 4m 6
- Vrachtwagenstation 6
- Gekantelde Muur 8m 5
- Transportbandmuur x3 5
- Prioriteitsstroomschakelaar 5
- Omgekeerde Hoek Omhoog 1m 3
- Lichtbedieningspaneel 3
- Hoogspanningsmast met Platform 3
- Grote Metalen Pilaar 2
- Frame Raam 2
- Transportbandmuur x1 2
- Omgekeerde Hellingmuur 8m 2
- Werkbank 2
- Persoonlijke opslag 2
- Pijpleiding Mk.1 2
- Leeg platform 2
- Hoogspanningsmast 2
- Hoek Helling Omhoog 1m 1
- Dubbele Helling 2m 1
- Halve 1m Fundering 1
- Gekantelde Holle Muur 8m 1
- Barricade 1
- Labelbord 4m 1
- AWESOME-Winkel 1
- Uitrustingswerkplaats 1
- Leeg platform met loopbrug 1
- Beton 11.698
- Hogesnelheidsdraad 6.462
- Kabel 4.820
- Draad 4.105
- Stalen balk 3.234
- IJzeren plaat 2.897
- IJzeren Stang 2.422
- Stalen pijp 1.804
- Alclad aluminiumplaat 1.584
- Versterkte ijzeren plaat 1.370
- Echte Sneeuw 1.000
- rotor 698
- Modulair frame 650
- Silica 540
- Kwartskristal 432
- Zwaar modulair frame 228
- Schroef 200
- Gefuseerd Modulair Frame 170
- Hogesnelheidsverbinding 154
- Gewapend betonnen balk 153
- motor 145
- Computer 144
- Zuurstok 100
- Supercomputer 85
- Printplaat 78
- Draagbare delver 51
- Turbomotor 51
- Koperplaat 45
- KI-begrenzer 34
- FICSMIS versiering 20
-
xbb1024 - 1 dec. 2023 08:26:11
From version 3.0, the power switches have been moved to the middle building
-
xbb1024 - 18 aug. 2022 12:42:34
There are power switches in the the first building on the lower floor
-
swagger_jacker - 14 aug. 2022 18:03:34
I am having a difficult time getting the power to flow properly. I hooked up to the transfer station and nothing happened. I then connected to some other power points and was able to get parts working but the factory is still without power. Ideas? Hoping i dont have to run around and replace all cables.