Desert Control Rods Factory (Update 8)
Factory in the sandy desert to make Control Rods (80pm) and AI limiters (110pm, 80pm needed for control rod production). This blueprint includes:
- 20 x Electromagnetic Control Rod assemblers
- 22 x AI Limiter assemblers
- 24 x Stator assemblers
- 24 x Fused Quickwire assemblers
- 56 x Copper Sheet constructors
- 44 x Iron Wire constructors
- 18 x Steel Pipe constructors
AI Limiters will go to Control Rod production first, and only overflow will be sent to transport. This is controlled by a smart splitter in the control rod building, and in the main logistics bus under the floor in the copper sheets building.
Logistics:
Iron, copper and caterium ingots are produced around the map. If you choose to use trucks, fuel will be required (not supplied in the blueprint). Steel is not produced in the blueprint, and will need to be delivered either via truck or train (there's coal in the north of the desert, and oil to the south).
Steel is delivered via train (the northern station). You can either set up your own steel mill, or use my https://satisfactory-calculator.com/megaprints/index/details/id/1206/name/Desert+Steelworks megaprint.
You may need to either supplement the caterium ingots from another location or overclock the miner.
Modded Content:
This blueprint uses oversized pieces. The floor under the constructors are normal sized to facilitate changes (if needed). If you want to modify the oversized pieces, I used a mod called Micro Manage
Version History:
- Version 1.0: Original version
- Version 2.0: Changed for update 5 and update 6 map. Also removed multiple dependencies on my other blueprints, to reduce complexity.
- Version 3.0: General reorganization of production. Added conveyors to ingot supplies.
- Version 4.0: General reorganization for update 8
- Hoeveelheid spullen 6.405
- Coördinaten 246.354 / -117.467
- Alleen plakken op originele locatie Yes
- Categorieën Architecture Complete factory Tracks system Modded UPDATE 8
- Created on 5 sep. 2022 07:35:31
- Last updated on 1 dec. 2023 07:37:44
- Stroomkabel 710
- Fundering 1m 575
- Transportband Mk.5 372
- Transportlift Mk.1 346
- Transportbandverdeler 319
- Transportlift Mk.2 309
- Paneel Raam 305
- Transportband samenvoeger 238
- Paneel Raam 236
- Gekantelde Muur 8m 235
- Standaard Muur 4m 165
- Transportband Mk.3 160
- Wandcontact Mk.1 158
- Transportlift Mk.5 156
- Fundering 1m 148
- Samensteller 124
- Transportband Mk.4 101
- Plafondlamp 99
- Assembleerder 98
- Grote Betonnen Pilaar 96
- Ondersteuning Transportband 95
- Transportband Mk.2 94
- Lantaarnpaal 87
- Vloergat Transportlift 86
- Standaard Muur 1m 76
- Catwalk Trap 76
- Frame Fundering 69
- Glazen Frame Fundering 52
- Standaard Muur 4m 51
- Volledig Frame Raam 46
- Transportlift Mk.3 41
- Transportband Plafondmontage 39
- Kleine Betonnen Pilaar 37
- Smeltoven 36
- Gespoten Balk 27
- Muur met Deur Zijkant 27
- Halve 1m Fundering 26
- Metaalgieterij 24
- Fundering 4m 22
- Gekantelde Muur 4m 22
- Plat Dak 18
- Hellingmuur 4m 18
- Industriële opslagcontainer 18
- Transportlift Mk.4 18
- Spoorweg 17
- Catwalk Kruising 15
- Omgekeerde Hoek Omhoog 1m 14
- Omgekeerde Hellingmuur 4m 14
- FICSMIS Sneeuwmachine 14
- Industriële Reling 13
- Portret Bord 12
- Delver Mk.3 11
- Gekantelde Muur 8m 10
- Catwalk T-Splitsing 10
- Ladder 10
- Fundering 2m 9
- Catwalk Hoek 9
- Metalen Balk 8
- Blok Seinpaal 8
- Energiemast Mk.1 8
- Frame Raam 7
- Moderne Reling 7
- Stroomschakelaar 7
- Vrachtwagenstation 6
- Vrachtperron 6
- Labelbord 3m 5
- Omgekeerde Helling 1m 4
- Dubbele Helling 8m 4
- Muur met Deur Midden 4
- Vierkant Bord 1m 4
- Lichtbedieningspaneel 3
- Transportbandmuur x2 3
- Halve 4m Fundering 2
- Halve 1m Fundering 2
- Fundering 4m 2
- Omgekeerde Hoek Omhoog 1m 2
- Fundering 1m 2
- Muurgemonteerde Schijnwerper 2
- Kleine Frame Pilaar 2
- Kleine Metalen Pilaar 2
- Transportbandmuur x1 2
- Standaard Muur 1m 2
- Catwalk Helling 2
- Dronehaven 2
- Transportband Mk.1 2
- Intelligente verdeler 2
- Treinstation 2
- Hoogspanningsmast 2
- Prioriteitsstroomschakelaar 2
- Hoek Helling Omhoog 1m 1
- Fundering 1m 1
- Grote Metalen Pilaar 1
- Transportbandmuur x3 1
- Omgekeerde Hellingmuur 8m 1
- Catwalk Recht 1
- Vierkant Bord 0.5m 1
- Muurbevestigingspunt Transportband 1
- Beton 7.499
- Hogesnelheidsdraad 6.114
- Kabel 3.850
- Draad 2.916
- IJzeren plaat 2.288
- Stalen balk 1.910
- IJzeren Stang 1.855
- Versterkte ijzeren plaat 1.815
- Echte Sneeuw 1.400
- Silica 1.188
- Stalen pijp 1.045
- Alclad aluminiumplaat 784
- rotor 756
- Modulair frame 330
- Kwartskristal 156
- Hogesnelheidsverbinding 146
- Gewapend betonnen balk 141
- Zuurstok 140
- Gefuseerd Modulair Frame 110
- Aluminium behuizing 100
- Zwaar modulair frame 84
- Supercomputer 55
- Draagbare delver 33
- Turbomotor 33
- motor 30
- FICSMIS versiering 28
- Computer 28
- Printplaat 24
- Radiografische controle-eenheid 20
- KI-begrenzer 18
- Koperplaat 16
-
xbb1024 - 4 apr. 2023 14:27:07
v3.0 released, all conveyors have been checked
-
xbb1024 - 28 mrt. 2023 16:15:51
I've been away from the game for a while, but I will be revising my larger megaprints to make sure they still work.
-
ptxs520 - 7 nov. 2022 22:23:13
Your electromagnetic rod can't receive AI controller, and many machines can't receive copper wire
-
xbb1024 - 3 sep. 2022 14:34:48
Version 2.0 no longer needs stators to be imported, instead it just needs Steel ingots
-
xbb1024 - 11 mrt. 2022 09:40:41
For 26 Electromagnetic Control Rod assemblers, you will need 26 x 6 = 156 Stators.
-
BlazerBuddy - 14 feb. 2022 15:24:49
How many Stators per minute does it require?