Rocky Desert Frame Factory
Complete factory making a variety of 'frame' components. Requires https://satisfactory-calculator.com/megaprints/index/details/id/1382/name/Rocky+Desert+Concrete+%26+Iron for concrete and metals, and https://satisfactory-calculator.com/megaprints/index/details/id/776/name/Westshore+Oil+and+Aluminum for fuel and rubber.
Also requires Radio Control Units to be delivered via drone to produce Pressure Conversion Cubes.
Important Note: the space elevator (as seen in the images) does not paste via the blueprint. It is non-essential to production.
Site Breakdown
North West Wing
- Modular Frame assemblers x 96
- Pressure Conversion Cube assemblers x 16
- Iron Rod constructors x 64
- Heat-Fused Frame blenders x 10
- Nitric Acid blenders x 2
North East Wing
- Heavy Encased Frame manufacturers x 24
- Flexible Framework manufacturers x 4
- Iron Rod constructors x 8
- Iron Plate constructors x 50
- Nitric Acid blenders x 6
South Wing
- Stitched Iron Plate assemblers x 48
- Fused Wire assemblers x 20
- Encased Industrial Pipe assemblers x 50
- Steel Beam constructors x 8
- Steel Pipe constructors x 112
Foundry Fields
- 24 Caterium smelters, fed from 480pm Caterium ore, producing 160pm Caterium Ingots
- 4 Copper Alloy foundries, producing 400pm Copper Ingots
- 64 Solid Steel foundries, producing 3840pm Steel Ingots
Logistics
Required connections:
- Concrete and Iron via train
- Fuel pipeline under south west bridge
- Aluminium and Rubber via train
- Radio Control Units via drone
Power
Substation in the foundry fields in the south east.
Modded Content
Uses enlarged pieces for walls and roads. Floors under production machinery are regular pieces to help alterations.
Version History
- 1.0: Initial Version
- 2.0: Site redesign using new pieces.
- 2.1: Redone rail to incorporate changes in the Concrete and Iron megaprint. Moved foundries into this megaprint.
- Hoeveelheid spullen 16.566
- Coördinaten -194.293 / -27.095
- Alleen plakken op originele locatie Yes
- Categorieën Architecture Complete factory Exterior decorations Pipes system Tracks system Modded UPDATE 8
- Created on 26 jun. 2021 20:24:33
- Last updated on 18 aug. 2023 09:58:35
- Fundering 1m 1.997
- Stroomkabel 1.422
- Transportlift Mk.2 1.349
- Transportband Mk.5 1.327
- Transportbandverdeler 836
- Gekantelde Muur 8m 730
- Transportband samenvoeger 652
- Frame Raam 522
- Paneel Raam 522
- Transportband Mk.3 450
- Transportband Mk.2 430
- Ondersteuning Transportband 410
- Transportlift Mk.5 405
- Standaard Muur 4m 314
- Catwalk Trap 272
- Fundering 1m 256
- Wandcontact Mk.1 243
- Samensteller 242
- Assembleerder 232
- Plafondlamp 221
- Volledig Frame Raam 209
- Vloergat Transportlift 198
- Frame Fundering 166
- Fundering 4m 132
- Transportlift Mk.3 129
- Lantaarnpaal 125
- Metaalgieterij 120
- Glazen Frame Fundering 117
- Transportlift Mk.1 113
- Transportband Mk.1 110
- Grote Betonnen Pilaar 99
- Gespoten Balk 97
- Transportband Mk.4 91
- Omgekeerde Hoek Omhoog 1m 74
- Pijpleiding Mk.1 73
- 4m Dak 65
- Pijpleiding Mk.1 (Geen Indicator) 60
- Muur met Deur Zijkant 59
- Standaard Muur 4m 56
- Pijpleidingskruispunt 53
- Halve 1m Fundering 52
- Halve 2m Fundering 50
- Hellingmuur 4m 50
- Omgekeerde Hellingmuur 4m 48
- Paneel Raam 45
- Transportbandmuur x3 42
- Hellingmuur 8m 42
- Muurdoorgang Pijpleiding 36
- Kleine Betonnen Pilaar 35
- Vierkant Bord 1m 32
- Standaard Muur 1m 30
- Labelbord 3m 30
- Industriële opslagcontainer 29
- Catwalk Hoek 28
- Fabrikator 28
- Spoorweg 28
- Industriële Reling 27
- Pijpleiding Mk.2 27
- Omgekeerde Hellingmuur 8m 24
- Transportlift Mk.4 23
- Pijpleiding muurondersteuning 22
- Fundering 1m 21
- Frame Vloer 21
- Gekantelde Muur 4m 21
- Muur met Deur Midden 20
- Geautomatiseerde Poort 20
- Catwalk T-Splitsing 19
- FICSMIS Sneeuwmachine 18
- mixer 18
- Stroomschakelaar 16
- Transportbandmuur x2 15
- Vrachtperron 15
- Energiemast Mk.1 14
- Portret Bord 13
- Transportband Plafondmontage 13
- Omgekeerde Hoek Omhoog 1m 12
- Kleine Frame Pilaar 12
- Omgekeerde Hellingmuur 2m 12
- Delver Mk.3 12
- Smeltoven 12
- Muurbevestigingspunt Transportband 11
- Plat Dak 10
- Muur met Deur Zijkant 10
- Pijpleidingsondersteuning 10
- Plat Dak 9
- Muurgemonteerde Schijnwerper 9
- Gekantelde Holle Muur 8m 9
- Hellingmuur 8m 9
- Hellingmuur 1m 9
- Ladder 9
- Catwalk Helling 9
- Moderne Reling 9
- Catwalk Kruising 9
- Fundering 2m 8
- Halve 1m Fundering 8
- Muur met Deur Midden 8
- Grote Metalen Pilaar 7
- Catwalk Recht 7
- Vierkant Bord 0.5m 7
- Blok Seinpaal 7
- Omgekeerde Helling 4m 6
- Grote Pilaarondersteuning 6
- Metalen Balk 6
- Balk verbindingspunt dubbel 6
- Omgekeerde Hellingmuur 8m 6
- Gekantelde Holle Muur 4m 6
- Standaard Muur 1m 6
- Hellingmuur 2m 6
- Poortgatmuur 6
- Dronehaven 6
- 2m Dak 5
- Lichtbedieningspaneel 4
- Treinstation 4
- Halve 4m Fundering 3
- Gekantelde Muur 8m 3
- Omgekeerde Hellingmuur 1m 3
- Hellingmuur 2m 3
- AWESOME-Winkel 3
- Water-extractor 3
- Pijpleiding Mk.2 (Geen Indicator) 3
- Hoek Helling Omhoog 1m 2
- Kleine Metalen Pilaar 2
- Balk Verbindingspunt 2
- Frame Muur 2
- Intelligente verdeler 2
- Hoogspanningsmast Mk.2 2
- Prioriteitsstroomschakelaar 2
- Hoek Helling Omlaag 1m 1
- Helling 1m 1
- Transportbandmuur x1 1
- Industriële vloeistoffenbuffer 1
- Stapelbare Ondersteuning Transportband 1
- Pijpleidingspomp Mk.1 1
- Hoogspanningsmast 1
- Beton 22.104
- Hogesnelheidsdraad 13.513
- Kabel 9.295
- Versterkte ijzeren plaat 5.606
- Draad 5.166
- IJzeren plaat 4.853
- Stalen balk 4.508
- IJzeren Stang 4.093
- Silica 2.596
- Alclad aluminiumplaat 2.437
- rotor 2.164
- Echte Sneeuw 1.800
- Plastic 1.460
- Stalen pijp 1.333
- Modulair frame 1.200
- Aluminium behuizing 1.200
- Zwaar modulair frame 689
- Schroef 600
- motor 575
- Koperplaat 563
- Kwartskristal 387
- Hogesnelheidsverbinding 235
- Zuurstok 180
- Gewapend betonnen balk 155
- Radiografische controle-eenheid 150
- Gefuseerd Modulair Frame 120
- Computer 62
- Supercomputer 60
- FICSMIS versiering 36
- Draagbare delver 36
- Turbomotor 36
- KI-begrenzer 30
- Printplaat 22
-
xbb1024 - 2 jun. 2023 22:17:06
The caterium deposit is just west of the site on a plateau, it should be pretty close
-
xbb1024 - 29 mrt. 2023 14:29:14
I'm using the stitched iron plate recipe for reinforced plates, which is in tower 1 (south building). Encased industrial beams are also produced in tower 1. Production and distribution seems to work fine in my save file, it could be it just takes a long time to get going because of how much steel input is required to get to all the machines. If you still have issues, I'm on discord as username xbb1024
-
xbb1024 - 28 mrt. 2023 16:03:22
Hi, sorry I've been away from this game for a while. I'll look into the error, but also please check if you have all the alternate recipes unlocked
-
Captain Jean-Luc Picard - 10 mrt. 2023 03:29:20
I have a problem, there is a defect somewhere in the factory. Reinforced Iron Plates don't seem to be produced anywhere and there is a bug somewhere in the distribution of the Encased Industrial Beam. Please im help.
-
jneal - 20 feb. 2023 06:00:13
what mod do you use for the enlarged pieces I am looking for it
-
dak4482 - 10 jan. 2023 06:37:34
Hi great site. I have looked everywhere. Where is the caterium input that you state is under the S/E bridge. There are six conveyors there. 5 are marked steel and one copper. I dont see a caterium indication anywhere. Help?
-
Swooosh - 17 sep. 2022 09:17:15
I take my hat off to your factories and constructions! They help me a lot and inspire me.