Desert Steelworks
Desert metalworks factory primarily to produce steel pipe (to supply my Desert Motors factory), but also produces steel beams, copper sheets, iron plates and screws.
Steelworks
The southern site in this blueprint, featuring 96 Iron Ingot smelters and 48 Solid Steel Ingot foundries. Coal is delivered via train.
Metal Fabrication Factory
Produces basic metal parts, featuring:
- 14 x Caterium Wire constructors
- 14 x Cable constructors
- 45 x Iron Plate constructors
- 14 x Iron Rod constructors
- 14 x Steel Beam constructors
- 28 x Copper Sheet constructors
- 56 x Steel Pipe constructors
- 30 x Cast Screw constructors
Ground floor of the middle building contains the power room for the site.
Logistics
Train route to collect coal from the north of the desert to the steelworks. Second train route to deliver metals from the steelworks to metal fabrication factory. At the factory, produced goods are delivered both by conveyors under the road, and by truck in case your factory is far away. If you want to use the truck stations, you will need to supply fuel (input under south road, indicated by a sign).
Power switches inside the middle building ground floor of the main factory site. Connect power to any of the power pylons running south-north.
Version History
- V1.0: Initial Version.
- V2.0: updated together with my desert motors factory in the area. Also uses Update 6 parts.
- v2.1: Fixed missing conveyor lift on steel foundry output (south foundry stack). Also minor adjustments to railway.
- V3.0: Overall reorganization using update 8 pieces, adjusted to work with my other Dune Desert megaprints.
Modded Content
This blueprint uses oversized pieces, mainly for walls, roads and walkways. I have left the floor under constructors as regular pieces to allow for easier change.
- Recuento de objetos 8.383
- Coordenadas 318.494 / -198.311
- Pegar sólo en la ubicación original Yes
- Categorías Architecture Complete factory Tracks system Modded UPDATE 8
-
Puntuación
5 / 5
- Versión de compilación 269.772
- Autor xbb1024
- Descargar (10.338x) Descargar
- Tamaño del archivo 1,13 MB
- Creado el 7/12/2021 4:32:24
- Última actualización el 1/12/2023 7:48:46
-
Línea eléctrica
930
-
Cimiento (1 m)
829
-
Cinta transportadora Mk.5
766
-
Divisor de Cinta transportadora
440
-
Cinta elevadora Mk.1
428
-
Cinta Elevadora Mk.5
409
-
Cinta Elevadora Mk.2
302
-
Unión de cintas transportadoras
282
-
Pared básica (4 m)
272
-
Poste de cinta transportadoras
247
-
Cimiento de armazón
234
-
Toma de corriente de pared Mk.1
224
-
Constructor
215
-
Pared inclinada (8 m)
211
-
Ventana de panel
210
-
Cinta Transportadora Mk.2
178
-
Horno
132
-
Luz de techo
107
-
Vía de tren
104
-
Fundación Media (1 m)
100
-
Cinta transportadora Mk.4
91
-
Pilar de hormigón grande
85
-
Cinta transportadora Mk.3
70
-
Cimiento (1 m)
68
-
Farola
68
-
Cimiento (4 m)
66
-
Pared básica (4 m)
59
-
Ventana enmarcada completa
58
-
Fundición
56
-
Cimiento de armazón de cristal
54
-
Viga Pintada
47
-
Pared básica (1 m)
47
-
Agujero de suelo para cinta elevadora
47
-
Rampa de pasadizo
38
-
Escaleras de pasadizo
32
-
Contenedor de almacenamiento industrial
31
-
Cinta Elevadora Mk.4
31
-
Señal de bloque
29
-
Plataforma de carga
29
-
Viga de metal
26
-
Escalera
26
-
Cimiento (2 m)
25
-
Fundación Media (4 m)
24
-
Pilar de hormigón pequeño
24
-
Cinta Elevadora Mk.3
23
-
Poste de Energía Mk.1
23
-
Cuarto de tubería
22
-
Cartel vertical
21
-
Señal con etiqueta (3 m)
21
-
Control por interruptor del ferrocarril
19
-
Cimiento (1 m)
18
-
Cantera Mk.3
17
-
Interruptor de alimentación
16
-
Pared con puerta lateral
15
-
Señal de trayecto
14
-
Cimiento (1 m)
12
-
Pilar de metal pequeño
12
-
Pared inclinada (4 m)
11
-
Pasadizo recto
11
-
Señal cuadrada (1 m)
11
-
Poste de cinta transportadora apilable
11
-
Esquina arriba invertida (1 m)
10
-
Señal cuadrada (2 m)
10
-
Cañón de nieve de FICSIVIDAD
10
-
Montura de tejado para cinta transportadora
10
-
Doble rampa (8 m)
9
-
Cruce en T de pasadizo
9
-
Divisor inteligente
9
-
Estación de tren
9
-
Fundación Media (2 m)
7
-
Tejado plano
7
-
Esquina de pasadizo
7
-
Pilar de armazón pequeño
6
-
Pared rampa inclinada (4 m)
6
-
Estación de camiones
6
-
Pared inclinada (8 m)
5
-
Pared transportadora x 3
5
-
Interruptor de prioridad
5
-
Esquina arriba invertida (1 m)
3
-
Panel de control de luces
3
-
Plataforma de torre de energía
3
-
Pilar de metal grande
2
-
Ventana enmarcada
2
-
Pared transportadora x 1
2
-
Pared rampa inclinada (8 m)
2
-
Banco de trabajo
2
-
Caja de almacenamiento personal
2
-
Tubería Mk.1
2
-
Plataforma vacía
2
-
Torre de energía
2
-
Rampa de esquina arriba (1 m)
1
-
Doble rampa (2 m)
1
-
Fundación Media (1 m)
1
-
Pared inclinada cóncava (8 m)
1
-
Barrera de contención
1
-
Señal con etiqueta (4 m)
1
-
Tienda AWESOME
1
-
Taller de equipamiento
1
-
Plataforma Vacía con Pasadizo
1
-
Hormigón
15.598
-
Alambre
8.805
-
Turboalambre
6.712
-
Cable
3.870
-
Plancha de hierro
3.523
-
Viga de acero
3.185
-
Barra de hierro
2.422
-
Tubería de acero
1.804
-
Lámina de aluminio revestido
1.584
-
Plancha de hierro reforzada
1.370
-
Plástico
1.175
-
Nieve de verdad de FICSIVIDAD
1.000
-
Rotor
698
-
Armazón modular
650
-
Viga industrial reforzada
563
-
Sílice
540
-
Cristal de cuarzo
432
-
Adorno metálico de FICSIVIDAD
200
-
Tornillos
200
-
Armazón modular fusionado
170
-
Conector de alta velocidad
154
-
Motor
145
-
Bastón de caramelo
100
-
Supercomputadora
85
-
Taladro portátil
51
-
Motor turbo
51
-
Ordenador
43
-
Limitador de IA
34
-
Lámina de Cobre
2
-
xbb1024 - 1/12/2023 8:26:11
From version 3.0, the power switches have been moved to the middle building
-
xbb1024 - 18/8/2022 12:42:34
There are power switches in the the first building on the lower floor
-
swagger_jacker - 14/8/2022 18:03:34
I am having a difficult time getting the power to flow properly. I hooked up to the transfer station and nothing happened. I then connected to some other power points and was able to get parts working but the factory is still without power. Ideas? Hoping i dont have to run around and replace all cables.