Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Wire 2x Wire
Constructor
Constructor
Wire (2/min)
Smelter
Smelter
Copper Ingot (0.66666666666667/min)
Needed per minute
Copper Ore0.66666666666667x Copper Ore
Copper Ingot0.66666666666667x Copper Ingot
Wire2x Wire
Smelter1x Smelter5x , 8x
Constructor1x Constructor3x , 2x
Total: