Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Wire 1x Wire
Constructor
Constructor
Wire (1/min)
Smelter
Smelter
Copper Ingot (0.33333333333333/min)
Circuit Board 1x Circuit Board
Assembler
Assembler
Circuit Board (1/min)
Constructor
Constructor
Wire (12/min)
Smelter
Smelter
Copper Ingot (4/min)
Needed per minute
Crude Oil8x Crude Oil
Plastic6x Plastic
Circuit Board1x Circuit Board
Copper Ore4.3333333333333x Copper Ore
Copper Ingot4.3333333333333x Copper Ingot
Wire13x Wire
Oil Refinery1x Oil Refinery4x , 8x , 20x , 25x
Assembler1x Assembler3x , 4x , 10x
Smelter2x Smelter10x , 16x
Constructor2x Constructor6x , 4x
Total: