Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Wire 1x Wire
Constructor
Constructor
Wire (1/min)
Smelter
Smelter
Copper Ingot (0.33333333333333/min)
Cable 1x Cable
Constructor
Constructor
Cable (1/min)
Constructor
Constructor
Wire (2/min)
Smelter
Smelter
Copper Ingot (0.66666666666667/min)
Needed per minute
Cable1x Cable
Copper Ore1x Copper Ore
Copper Ingot1x Copper Ingot
Wire3x Wire
Smelter2x Smelter10x , 16x
Constructor3x Constructor9x , 6x
Total: