Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Wire 1x Wire
Constructor
Constructor
Wire (1/min)
Smelter
Smelter
Copper Ingot (0.33333333333333/min)
Miner MK2
Miner MK2
Copper Ore (0.33333333333333/min)
Needed per minute
Copper Ore0.33333333333333x Copper Ore
Copper Ingot0.33333333333333x Copper Ingot
Wire1x Wire
Miner MK21x Miner MK22x , 5x , 10x , 15x
Smelter1x Smelter5x , 8x
Constructor1x Constructor3x , 2x
Total: