Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Spiked Rebar 1x Spiked Rebar
Constructor
Constructor
Spiked Rebar (1/min)
Constructor
Constructor
Iron Rod (1/min)
Smelter
Smelter
Iron Ingot (1/min)
Needed per minute
Iron Ore1x Iron Ore
Iron Ingot1x Iron Ingot
Iron Rod1x Iron Rod
Spiked Rebar1x Spiked Rebar
Smelter1x Smelter5x , 8x
Constructor2x Constructor6x , 4x
Total: