Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Rotor 9x Rotor
Assembler
Assembler
Rotor (6/min)
Constructor
Constructor
Iron Rod (15/min)
Smelter
Smelter
Iron Ingot (15/min)
Constructor
Constructor
Iron Rod (3/min)
Smelter
Smelter
Iron Ingot (3/min)
Constructor
Constructor
Screw (90/min)
Constructor
Constructor
Iron Rod (15/min)
Smelter
Smelter
Iron Ingot (15/min)
Constructor
Constructor
Screw (42/min)
Constructor
Constructor
Iron Rod (7/min)
Smelter
Smelter
Iron Ingot (7/min)
Assembler
Assembler
Rotor (3/min)
Constructor
Constructor
Iron Rod (9/min)
Smelter
Smelter
Iron Ingot (9/min)
Constructor
Constructor
Screw (66/min)
Constructor
Constructor
Iron Rod (11/min)
Smelter
Smelter
Iron Ingot (11/min)
Needed per minute
Screw198x Screw
Iron Ore60x Iron Ore
Iron Ingot60x Iron Ingot
Iron Rod60x Iron Rod
Rotor9x Rotor
Smelter6x Smelter30x , 48x
Constructor9x Constructor27x , 18x
Assembler2x Assembler6x , 8x , 20x
Total: