Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Circuit Board 1x Circuit Board
Assembler
Assembler
Circuit Board (1/min)
Constructor
Constructor
Wire (12/min)
Smelter
Smelter
Copper Ingot (4/min)
Miner MK2
Miner MK2
Copper Ore (4/min)
Oil Refinery
Oil Refinery
Plastic (6/min)
Oil Pump
Oil Pump
Crude Oil (8/min)
Needed per minute
Crude Oil8x Crude Oil
Plastic6x Plastic
Copper Ore4x Copper Ore
Copper Ingot4x Copper Ingot
Wire12x Wire
Circuit Board1x Circuit Board
Oil Pump1x Oil Pump5x , 10x , 30x
Oil Refinery1x Oil Refinery4x , 8x , 20x , 25x
Miner MK21x Miner MK22x , 5x , 10x , 15x
Smelter1x Smelter5x , 8x
Constructor1x Constructor3x , 2x
Assembler1x Assembler3x , 2x
Total: