Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
Items to produce
Circuit Board 1x Circuit Board
Assembler
Assembler
Circuit Board (1/min)
Constructor
Constructor
Wire (6/min)
Smelter
Smelter
Copper Ingot (2/min)
Needed per minute
Crude Oil4x Crude Oil
Plastic3x Plastic
Copper Ore2x Copper Ore
Copper Ingot2x Copper Ingot
Wire6x Wire
Circuit Board1x Circuit Board
Oil Refinery25x Oil Refinery100x , 200x , 500x , 625x
Smelter8x Smelter40x , 64x
Constructor2x Constructor6x , 4x
Assembler10x Assembler30x , 40x , 100x
Total: