Enter the number you wish to produce per minute, the calculator will try to find a possible solution to provide a valid production chain.
You can drag the network graph with the mouse, zoom in/out with the mouse wheel.
Options
A.I. Limiter 1x A.I. Limiter
Assembler
Assembler
A.I. Limiter (1/min)
Assembler
Assembler
Circuit Board (1/min)
Constructor
Constructor
Wire (12/min)
Smelter
Smelter
Copper Ingot (4/min)
Miner MK2
Miner MK2
Copper Ore (4/min)
Oil Refinery
Oil Refinery
Plastic (6/min)
Oil Pump
Oil Pump
Crude Oil (8/min)
Constructor
Constructor
Quickwire (18/min)
Smelter
Smelter
Caterium Ingot (4.5/min)
Miner MK2
Miner MK2
Caterium Ore (13.5/min)
Oil Pump1x Oil Pump5x , 10x , 30x
Oil Refinery1x Oil Refinery4x , 8x , 20x , 25x
Miner MK22x Miner MK24x , 10x , 20x , 30x
Smelter2x Smelter10x , 16x
Constructor2x Constructor6x , 4x
Assembler2x Assembler6x , 4x
Total: