Aluminum Ingot 600/min Phase 4 mk5 6x4

Output

  • Aluminum Ingot 600/min
  • Rubber 20/min

Input

  • Bauxite Ore 600/min
  • Crude Oil 60/min
  • 468.9 MW

Size: 6x4 foundations

Notes

  • Stacked design, modifying machines, belts, or pipes will likely result in a non-functional factory.
  • Fresh and waste water handled separately, no prefilling necessary and safe from output jams.
  • First output within 1.5 minutes, 50% production at 3 minutes, 90% at 9 minutes. Full production reached after about 30 minutes.
  • Created on Jun 6, 2025, 7:46:11 PM
  • Last updated on Jun 6, 2025, 7:46:24 PM