Smart Plating 5/Min

17 by 7 grid

116.25 Iron Ore per minute for 5 Smart Plating Per Min

131 MW of power needed

I'm using a manifold method, so it will take a hot minute before production is up to 100%

The Iron Rod line is the one that takes the longest to "kick in" I usually help kick start it by putting at least 200 Iron rods in one Constructor.

  • Created on Dec 20, 2024, 2:01:47 AM
  • Last updated on Dec 20, 2024, 2:02:34 AM