

This simple junction allows four trains to pass through at the same time without interference. The three-layer design even allows four left-turning trains to traverse the junction simultaneously. It comes with all necessary signals.
UPDATE: Fixed clipping signals.
Please rate and review, so I can improve my designs.
- Items count 64
- Categories Tracks system
- Rating
- Build version 273,254
- Author Caduzeus
- Download (1,132x) Download SBP Download SBP Config
- File size 6.31 KB
- Created on Jul 23, 2024, 12:38:41 PM
- Last updated on Jul 23, 2024, 5:24:11 PM
- Live preview (Alpha Test) See blueprint