

just 11x10 Foundations of Space required. Ideal for a quick deployment of a Nuclear Powerplant. Produces 1 Uranium Fuel Rod / min. Production is tied to run at 100% efficiency when it smoothes out.
Takes: 90 Copper Ore /min 82 Iron Ore /min 90 Caterium Ore /min 82 Coal /min 100 Uranium /min 60 Sulfur /min 90 Limestone /min 120 Water /min
- Items count 926
- Categories Complete factory UPDATE 7 UPDATE 8
- Rating
- Build version 211,839
- Author Antero Draco
- Download (123x) Download SBP Download SBP Config
- File size 79.81 KB
- Created on Sep 14, 2023, 2:35:22 PM
- Last updated on Sep 14, 2023, 3:10:03 PM
- Live preview (Alpha Test) See blueprint