

40 Fuel in = 40 Rubber out
Requieres 36MW to operate
15 modules for Mk2 pipe of Fuel
Max amount of Rubber for Mk2 pipe of Crude Oil is 1600 from Fuel + 200 from Polymer Resin = 1800
You can re-calibrate this module for any Rubber output folowing this scheme:
~ for the first Refinary target production rate is your desiered amount of Fuel input (or Rubber output) multiplied by 2/3
~ for the second Refinary is input multiplied by 4/3
For example to reduce amount of modules for Mk2 pipe of Fuel to 6:
~ 100 * 2 / 3 = 66.667
~ 100 * 4 / 3 = 133.334
It gives you 100 in 100 out and adds 4 Power Shards to a cost (120.7MW).
For the balance between Power Shards (2) and amount of modules (7):
~ 600 / 7 * 2 / 3 = 57.14285714285714
~ 600 / 7 * 4 / 3 = 114.28571428571428
Production rate here will be 600 / 7 = 85.71428571428571 from one module (98.4MW).
Another modification that you can make is removing 1 Splitter and 1 Merger. Nothing wil change in the output, but you should wait until first Refinary will be filld to the full stack of its input resource.
- Items count 20
- Categories UPDATE 7
- Rating
- Build version 211,116
- Author grayhole.p
- Download (2,883x) Download SBP Download SBP Config
- File size 6.79 KB
- Created on Dec 10, 2022, 10:34:39 AM
- Last updated on Dec 10, 2022, 10:54:27 AM
- Live preview (Alpha Test) See blueprint