Turbo Fuel Power Plant

360 Turbofuel Generators arranged into 12 towers of 30. This site has a theoretical gross capacity of 54GW, and can be expanded if needed (oil nodes are not overclocked).

Site breakdown (main equipment):

  • Oil Extractors x 11 (needing 440MW)
  • Heavy Oil Residue refineries x 41 (30MW x 41 = 1230MW)
  • Petroleum Coke refineries x 7 (30MW x 7 = 210MW)
  • Diluted Fuel blender x 6 (75MW x 6 = 450MW)
  • Turbo Blend Fuel blender x 36 (75MW x 36 = 2700MW)
  • AWESOME Sink x 2 (30MW x 2 = 60MW)
  • Polymer Product refineries x 16 (30 MW x 16 = 480MW)

Also sources sulfur from the north east and directly south via train. Since the blueprint does not copy routes, you will need to set up the train route yourself.

  • Rating
    5 / 5
  • Build version 159,365
  • Author xbb1024
  • Download (650x)