A fully functioning compacted coal setup for 480 belts of Coal and Sulfur including miners. 33 x Coal Generators @ 250%, 33 x Assemblers @ 58%, 33 x Extractors @ 76% all connected in a 1:1. This will produce 5009.4 MW.

  • Bewertung
    5 / 5
  • Build-Version 159.365
  • Autor Smerkin5000
  • Download (6.772x) Download
  • Dateigröße 179,19 KB
  • Erstellt am 26.02.2021 08:10:37
  • Zuletzt aktualisiert am 12.07.2021 10:16:15