Desert Steelworks
Desert metalworks factory primarily to produce steel pipe (to supply my Desert Motors factory), but also produces steel beams, copper sheets, iron plates and screws.
Steelworks
The southern site in this blueprint, featuring 96 Iron Ingot smelters and 48 Solid Steel Ingot foundries. Coal is delivered via train.
Metal Fabrication Factory
Produces basic metal parts, featuring:
- 14 x Caterium Wire constructors
- 14 x Cable constructors
- 45 x Iron Plate constructors
- 14 x Iron Rod constructors
- 14 x Steel Beam constructors
- 28 x Copper Sheet constructors
- 56 x Steel Pipe constructors
- 30 x Cast Screw constructors
Ground floor of the middle building contains the power room for the site.
Logistics
Train route to collect coal from the north of the desert to the steelworks. Second train route to deliver metals from the steelworks to metal fabrication factory. At the factory, produced goods are delivered both by conveyors under the road, and by truck in case your factory is far away. If you want to use the truck stations, you will need to supply fuel (input under south road, indicated by a sign).
Power switches inside the middle building ground floor of the main factory site. Connect power to any of the power pylons running south-north.
Version History
- V1.0: Initial Version.
- V2.0: updated together with my desert motors factory in the area. Also uses Update 6 parts.
- v2.1: Fixed missing conveyor lift on steel foundry output (south foundry stack). Also minor adjustments to railway.
- V3.0: Overall reorganization using update 8 pieces, adjusted to work with my other Dune Desert megaprints.
Modded Content
This blueprint uses oversized pieces, mainly for walls, roads and walkways. I have left the floor under constructors as regular pieces to allow for easier change.
- Anzahl der Gegenstände 8.383
- Koordinaten 318.494 / -198.311
- Nur am ursprünglichen Ort einfügen Yes
- Kategorien Architecture Complete factory Tracks system Modded UPDATE 8
- Erstellt am 07.12.2021 04:32:24
- Zuletzt aktualisiert am 01.12.2023 07:48:46
- Stromleitung 930
- Fundament 1m 829
- Förderband Mk.5 766
- Förderbandsplitter 440
- Förderlift Mk.1 428
- Förderlift Mk.5 409
- Förderlift Mk.2 302
- Förderband-Fusionator 282
- Wand 4m 272
- Fördermast 247
- Rahmenfundament 234
- Wandstromverteiler Mk.1 224
- Konstruktor 215
- Geneigte Wand 8m 211
- Fensterwand mit Sprossen 210
- Förderband Mk.2 178
- Schmelzofen 132
- Deckenlicht 107
- Schiene 104
- Halbfundament 1m 100
- Förderband Mk.4 91
- Große Betonsäule 85
- Förderband Mk.3 70
- Fundament 1m 68
- Straßenbeleuchtung 68
- Fundament 4m 66
- Wand 4m 59
- Vollglas Fensterwand 58
- Gießerei 56
- Gläsernes Rahmenfundament 54
- Gefärbter Träger 47
- Wand 1m 47
- Förderlift-Fundamentdurchführung 47
- Laufstegrampe 38
- Laufstegtreppen 32
- Industrieller Lagercontainer 31
- Förderlift Mk.4 31
- Blocksignal 29
- Frachtplattform 29
- Metallträger 26
- Leiter 26
- Fundament 2m 25
- Halbfundament 4m 24
- Kleine Betonsäule 24
- Förderlift Mk.3 23
- Strommast Mk.1 23
- Viertelrohr 22
- Porträt-Schild 21
- Beschriftungsschild 3m 21
- Weichen-Steuerung 19
- Fundament 1m 18
- Miner MK 3 17
- Netzschalter 16
- Wand mit seitlicher Tür 15
- Streckensignal 14
- Fundament 1m 12
- Kleine Metallsäule 12
- Geneigte Wand 4m 11
- Laufsteg Gerade 11
- Quadratisches Schild 1m 11
- Stapelbarer Förderbandmast 11
- Inv. Eckrampe aufwärts 1m 10
- Quadratisches Schild 2m 10
- FICSMAS Schneekanone 10
- Förderband-Deckenhalterung 10
- Doppelrampe 8m 9
- Laufsteg mit T-Kreuzung 9
- Intelligenter Splitter 9
- Bahnhof 9
- Halbfundament 2m 7
- Flachdach 7
- Laufstegecke 7
- Kleine Rahmensäule 6
- Inv. Rampenwand 4m 6
- Lkw-Station 6
- Geneigte Wand 8m 5
- Wand mit Förderbanddurchführung x3 5
- Prioritäts-Netzschalter 5
- Inv. Eckrampe aufwärts 1m 3
- Beleuchtungssteuerung 3
- Hochspannungsmast + Plattform 3
- Große Metallsäule 2
- Fensterwand 2
- Wand mit Förderbanddurchführung x1 2
- Inv. Rampenwand 8m 2
- Werkbank 2
- Persönliche Aufbewahrungsbox 2
- Rohr Mk.1 2
- Leere Plattform 2
- Hochspannungsmast 2
- Eck-Rampe aufwärts 1m 1
- Doppelrampe 2m 1
- Halbfundament 1m 1
- Geneigte Konkav-Wand 8m 1
- Straßensperre 1
- Beschriftungsschild 4m 1
- AWESOME-Shop 1
- Ausrüstungswerkstatt 1
- Leere Plattform mit Gehweg 1
- Beton 11.698
- Turbodraht 6.462
- Kabel 4.820
- Draht 4.105
- Stahlträger 3.234
- Eisenplatte 2.897
- Eisenstange 2.422
- Stahlrohr 1.804
- Alclad-Aluminiumplatte 1.584
- Verstärkte Eisenplatte 1.370
- Tatsächlich Schnee 1.000
- Rotor 698
- Modularer Rahmen 650
- Quarzsand 540
- Quarzkristall 432
- Schwerer modularer Rahmen 228
- Schraube 200
- Verschmolzener modularer Rahmen 170
- Highspeed-Anschluss 154
- Stahlbetonträger 153
- Motor 145
- Computer 144
- Zuckerstange 100
- Supercomputer 85
- Platine 78
- Mobiler Miner 51
- Turbomotor 51
- Kupferblech 45
- KI-Begrenzer 34
- FICSMAS Dekoration 20
-
xbb1024 - 01.12.2023 08:26:11
From version 3.0, the power switches have been moved to the middle building
-
xbb1024 - 18.08.2022 12:42:34
There are power switches in the the first building on the lower floor
-
swagger_jacker - 14.08.2022 18:03:34
I am having a difficult time getting the power to flow properly. I hooked up to the transfer station and nothing happened. I then connected to some other power points and was able to get parts working but the factory is still without power. Ideas? Hoping i dont have to run around and replace all cables.