

Simple fluid buffer for up to 10 different pipes. Can be stacked as often as required. Application:
- build Modular Fluid Buffer Bottom (1_3)
- build x Modular Fluid Buffer Mid (2_3) on top.
- build Modular Fluid Buffer Top (3_3) last.
- The total height must be higher than the highest building to be supplied with the fluids. No more pumps are required.
- Connect the side power connections and supply the Fluid Buffer with power.
- Antal genstande 125
- Kategorier Architecture Pipes system UPDATE 7 UPDATE 8 Stable (1.0) Stable (1.1)
- Bedømmelse
- Version 416.835
- Skaber de_complicator
- Hent (149x) Hent SBP Hent SBP-konfiguration
- Filstørrelse 12,97 KB
- Skabt den 11/06/2025 16.01.30
- Sidst opdateret den 11/06/2025 16.11.28
- Direkte forhåndsvisning (Alpha Test) See blueprint