

Provides 5 Power Control groups & 200MWh of power storage.
Version provided does not include windows. If you have the Halflings mod, you can place them yourself. The windows were removed to make the blueprint accessible to vanilla players.
On first boot:
- Wire "A" input (single ext. outlet) to your main grid
- Wire "B" outputs (five ext. outlets) to the sub-grids you would like to control
- Configure power switches
TIP: Utilise the sub-grid labels (★ ♥ ♦ ♠ ♣)! The "B" nodes are easy to identify by the asymmetry, but keep a pinout nearby, as provided on the entrance wall.
- Antal genstande 228
- Kategorier Power lines UPDATE 8
- Bedømmelse
- Version 273.254
- Skaber pepsichord
- Hent (1.167x) Hent SBP Hent SBP-konfiguration
- Filstørrelse 15,94 KB
- Skabt den 12/05/2024 21.06.40
- Sidst opdateret den 12/05/2024 21.27.23
- Direkte forhåndsvisning (Alpha Test) See blueprint