

Starting section for the subway. Control room for the lights in the subway tunnels. Make sure to connect the cables throughout the sections
- Antal genstande 272
- Kategorier Architecture Tracks system
- Bedømmelse
- Version 273.254
- Skaber Nataimas
- Hent (1.631x) Hent SBP Hent SBP-konfiguration
- Filstørrelse 16,15 KB
- Skabt den 30/01/2024 11.32.36
- Sidst opdateret den 30/01/2024 11.34.26
- Direkte forhåndsvisning (Alpha Test) See blueprint