

Use leaf for power (~74mw)
Put oil (60) = 26.667 fuel packaged/min
1 one hour before full heavy oil
Enjoy
- Antal genstande 149
- Kategorier Architecture Exterior decorations UPDATE 7
- Bedømmelse
- Version 211.839
- Skaber Celti
- Hent (2.256x) Hent SBP Hent SBP-konfiguration
- Filstørrelse 19,45 KB
- Skabt den 31/01/2023 12.52.48
- Sidst opdateret den 31/01/2023 12.53.33
- Direkte forhåndsvisning (Alpha Test) See blueprint