Main Bus MK5 (with end supports)

Main bus (mk5) with top return with the end supports. You must build the small segment between blueprints.

Cost: 98 Rods, 106 Iron Plate, 98 Concrete, 330 Alclad Sheet, 16 Plastic, 32 Copper Sheet

Inspired by StudleyKansas's Youtube Video (Satisfactory Main Bus Tutorial)

  • Skabt den 19/11/2022 21.21.08
  • Sidst opdateret den 19/11/2022 21.21.22