

Battery Array. Pillar in the top corner is just a marker to indicate the position of power connector below foundations. Remove it before scaling up.
- Items count 231
- الفئات Power lines UPDATE 7
- Rating
- Build version 211٬116
- Author Zoltar358
- تحميل (3٬946x) Download SBP Download SBP Config
- File size 11٫16 KB
- Created on 09/12/2022 11:51:06 ص
- Last updated on 09/12/2022 11:54:42 ص
- Live preview (Alpha Test) See blueprint