

A straight segment of the road with an underground access for the hidden conveyor bus. 2 lanes, 12m each, with a walkway and a hidden conveyor bus.
- Items count 57
- الفئات Architecture Tracks system
- Rating
- Build version 208٬572
- Author EduardoS
- تحميل (3٬438x) Download SBP Download SBP Config
- File size 5٫04 KB
- Created on 20/11/2022 11:00:04 م
- Last updated on 20/11/2022 11:02:20 م
- Live preview (Alpha Test) See blueprint